Florida's Strategic Intermodal System Explained
Several indicators on this site mention the SIS: delay on the SIS, congestion on SIS corridors, cargo at SIS airports. The Strategic Intermodal System is Florida's network of the transportation facilities that matter most for statewide and interregional travel and trade, and it shapes where a large share of state transportation money goes. Here is what it is and how it works.
Where the SIS came from
Florida's Governor and Legislature created the SIS in 2003 to focus state investment on the facilities most important to the state's economy, rather than spreading money evenly across every road. The idea was to plan airports, seaports, spaceports, rail and highways as one connected system, since a container arriving at a seaport or a traveler landing at an airport depends on the road or rail link that comes next. The system is defined in Chapter 339 of the Florida Statutes and managed by the Florida Department of Transportation (FDOT).
Hubs, corridors and connectors
The SIS is made up of three kinds of facilities:
| Component | What it includes | Examples of the type |
|---|---|---|
| Hubs | Places where people and goods enter, leave or change modes | Commercial service airports, deepwater seaports, spaceports, freight rail terminals, passenger rail and intercity bus terminals |
| Corridors | Long-distance links between regions and to other states | Interstates, Florida's Turnpike and other limited-access highways, major rail lines, shipping channels and waterways |
| Connectors | Short links that tie hubs to corridors | The access road from a port gate or airport terminal to the nearest interstate or rail line |
State law lists the pieces in more formal terms: highway corridors, appropriate parts of the National Highway System, airport, seaport and spaceport facilities, rail lines and facilities, selected intermodal and passenger and freight terminals, the connectors between them, and other corridors that serve a statewide or interregional purpose. A connector can be a county road or city street; SIS status depends on the facility's role, not on who owns it.
How a facility becomes part of the SIS
FDOT designates SIS facilities using criteria tied to how much activity a facility handles, such as passengers, freight tonnage or traffic volumes, and to its role in the statewide economy. Facilities that serve an important strategic role but do not yet meet the activity thresholds can be designated in a lower tier that FDOT calls Strategic Growth (an earlier version of the system used the label Emerging SIS). Designations are reviewed periodically, and facilities can be added or removed as activity changes. The criteria themselves have been updated over the years, so a facility's status should always be checked against FDOT's current SIS maps.
How big it is and how much it carries
By FDOT's figures, the SIS highway network is a fraction of the road system but carries a disproportionate share of its traffic. FDOT's 2020 Source Book counted roughly 4,300 centerline miles of SIS highway, against about 12,100 centerline miles on the whole State Highway System. FDOT planning documents have described SIS highways as carrying more than half of all traffic on the State Highway System and around 70 percent of its truck traffic. These shares shift as traffic grows and designations change, so treat them as an order of magnitude rather than a precise current value.
How SIS projects are funded
SIS designation does not guarantee money for a project, but it makes the facility eligible for state SIS funding and moves it up the priority list. Two features stand out:
- A statutory share of new capacity money. Florida law directs FDOT to allocate at least 50 percent of any new discretionary highway capacity funds, meaning capacity funding above the prior year's level, to the SIS.
- A staged pipeline of plans. FDOT tracks SIS projects through a sequence: the First Five Year Plan (projects funded in the adopted work program), the Second Five Year Plan (projects planned for the following five years), the long-range Cost Feasible Plan (projects expected to be affordable over the next couple of decades) and the Unfunded Needs Plan (needs with no identified funding). Projects can move forward or slip back as revenue estimates change.
Much of that funding comes from the State Transportation Trust Fund, which is built largely on fuel taxes. For a layer-by-layer look at that revenue, see where your gas tax money goes in Florida.
How this site tracks SIS performance
Several indicators focus on the SIS because it is where statewide mobility and freight movement are most visible:
- Statewide Daily Person Hours of Delay on SIS estimates the extra time travelers lose to congestion on SIS highways each day.
- Percent Miles Congested on SIS Corridors shows the share of SIS corridor miles operating at or near capacity in the peak hour.
- Florida Annual Cargo at 7 Commercial SIS Airports follows air cargo tonnage at major SIS airport hubs.
- Freight Movements at Florida's Seaports tracks waterborne tonnage at the ports, most of which are SIS hubs.
These series run through the mid-2010s on this site. Read them together: delay rising faster than travel suggests capacity is falling behind demand on key corridors, while growth in seaport and airport tonnage signals rising pressure on the connectors that serve those hubs.
Common questions
Is the SIS the same as the State Highway System?
No. The State Highway System is the set of roads FDOT owns and maintains, roughly 12,000 centerline miles. The SIS is a multimodal network defined by function. It includes many state highways but also airports, seaports, rail lines and some locally owned connectors.
Does SIS status mean a road will be widened?
Not by itself. It makes a facility eligible for SIS funding and part of statewide planning, but projects still compete for limited money and must clear environmental review and design.
Why does population growth matter for the SIS?
Most new residents and visitors travel on the same interstates and arrive through the same airports and ports. The growth patterns described in Florida's population boom and its impact on roads put pressure on SIS corridors first.